Contact
Focus Us On
DOWNLOAD

The Introduction of the Basic Debugging and Operation Methods of Riveting Machine

The Introduction of the Basic Debugging and Operation Methods of Riveting Machine

The basic operation methods of riveting machine and its preparation before the operation:

Operation methods:

1. Place the power switch in the "ON" position. At the moment, the motor and flywheel will work.

2. Place the required riveting material in the center of floatation of the core mold. And after the hole position is aligned, put the workpiece in and start the riveting action.

3. Step down the pedal, unlock the clutch, make the upper mold from the dead point down to the dead point, rivet the rivet into the fixed hole position of the material, then return to the original dead point and circulate and circulate the finishing movement.

Preparation before the operation :

1. Check if the platform is stable or not.

2. Check if power sockets are plugged or not.

3. Adjust the distance between the upper mold and the core by the standard rivet, start to test the mold and then proceed to trial mold to see if the riveting is suitable for all kinds of products.

4. Open the power supply and try the pedal. If the motor is working properly, it is ready to end. The operating strategy of the riveting machine is described.

1. Operation procedure:

Step down the treadmill of the riveting machine and unlock the disconnector. A manual flywheel is used to rotate the spindle clockwise so that the upper mold moves from the top dead center to the lower dead point and then returns to the upper dead point locking clutch, that is, a cycle. After adjusting the fit requirements, the spindle is moved with manual clockwise rotation and the adjustment ends.

2. Preparation before the operation :

Check if the machine is stable or not and if the power outlet is a plug or not. According to the standard of riveting, adjust the gap between the mold floating heart, start to test model, check if the riveting is fit the commodity machine or not. Open the power supply, test pedal, if the motor work is ready then prepare to end.

3. Abnormal disposal:

During the operation, if there are abnormal sounds, one should be stopped to see if the motor is under high temperature and tell the professionals to repair it. If the pedal is operated once and the action is normal for more than two times, the professional personnel should be advised to perform maintenance.

4. Operation methods:

The riveting machine's riveting parts are placed in the center of floatation of the core mold, and the holes are aligned, And after the hole position is aligned, put the workpiece in and start the riveting action.



Related News